|
Can you tell me why I have got -50 for consumption of technical blog?
|
|
|
|
|
Did you add, then remove, a technical blog? You get 50 points for having a blog, but you lose those points if you remove the blog.
cheers,
Chris Maunder
The Code Project | Co-founder
Microsoft C++ MVP
|
|
|
|
|
I get 50 points for adding a blog!?
How many blogs can I create? Per day? Per year?
|
|
|
|
|
Before reporting a problem I can see, I would like to say I can see that intensive work on improving the functionality of the site is going on. Thank you very much!
I noticed that with time, some comments to the same Answer changed their orders. This is very confusing. They come ordered by the time of posting and should stay this way because this reflects a time line of conversation, arguments, etc.
Thank you for understanding.
Sergey A Kryukov
|
|
|
|
|
Give us a day or so. We're finalise some nice additions to the comment system.
cheers,
Chris Maunder
The Code Project | Co-founder
Microsoft C++ MVP
|
|
|
|
|
To help with the confusion: you can choose the order manually.
There's a tab 'Top rated', which sorts based on popularity votes and there's a tab 'Most recent', which sorts reversed chronologically.
modified 13-Sep-18 21:01pm.
|
|
|
|
|
yes, there now is more confusion; I'm afraid you're talking about the order of the answers, not the comments.
Luc Pattyn [Forum Guidelines] [My Articles] Nil Volentibus Arduum
Please use <PRE> tags for code snippets, they preserve indentation, improve readability, and make me actually look at the code.
|
|
|
|
|
I talk about order of comments to the same answer (please my initial request see above)
Sergey A Kryukov
|
|
|
|
|
I am unable to find the delete button. Could the site moderators please help me with this.
Thanks.
|
|
|
|
|
I got a email saying my account is de activated. What does it mean? I can still make posts. Could my account not be deleted like of those who are spammers or trolls? Please delete it.
|
|
|
|
|
Why?
Have we upset you?
------------------------------------
I will never again mention that I was the poster of the One Millionth Lounge Post, nor that it was complete drivel. Dalek Dave
CCC League Table Link
CCC Link[ ^]
|
|
|
|
|
You may like to check GIT for his last few conversations.
..Go Green..
|
|
|
|
|
Not the Rest of the world but the Indians.
Sorry Dave, We Indians dont take criticism well. We should always be praised even if we dont desefve it.
On a serious note, IMHO he thinks, he is above everyone.
cheers,
Super
------------------------------------------
Too much of good is bad,mix some evil in it
|
|
|
|
|
super wrote: Not the Rest of the world but the Indians.
Sorry Dave, We Indians dont take criticism well. We should always be praised even if we dont desefve it.
On a serious note, IMHO he thinks, he is above everyone.
That was really uncalled for. What do you mean I don't take criticism well. I have several posts that are absolutely thrashed before. Even my article has been bashed by some people who think they are above everyone else. I have never cried over down votes etc. In fact I am one opf those who find such trivialities disgusting. Don't make bold statements on people you hardly know. That just shows that you think you are above everyone else.
|
|
|
|
|
Then why the heck is so much noise from you.
Just ignore all, send the email to chris and co and keep mum.
Its all started when your post( with curse words) was removed my GIT members. So just wind up and relax.
cheers,
Super
------------------------------------------
Too much of good is bad,mix some evil in it
|
|
|
|
|
How many times do I have to admit that asking people if at all deleting an account was possible was a HUGE mistake? Yes, I was stupid to ask people about that. I admit I was stupid. Now, I'll stay mum only if you let me be, without making provokative posts.
|
|
|
|
|
Peace be upon us
cheers,
Super
------------------------------------------
Too much of good is bad,mix some evil in it
|
|
|
|
|
So I'm to leave your account alone?
No problem, welcome back, here's a
cheers,
Chris Maunder
The Code Project | Co-founder
Microsoft C++ MVP
|
|
|
|
|
Dalek Dave wrote: Why?
Have we upset you?
It is not you, it is me.
|
|
|
|
|
bleedingfingers wrote: It is not you, it is me.
Come on. We all know that means its not me its you.
|
|
|
|
|
Take a breather. Don't come to the site for a couple of weeks....cool off and relax. Come back and it will be OK. I have had a hot head here as well and taking a breather can really help.
Whatever you do, don't delete your account...it's not worth it and it proves nothing.
|
|
|
|
|
This[^] page shows "-- There are no messages in this forum --" but there is no "New Message" widget, so I suspect the forum has not been created. If so, the message is not quite correct.
PS: I won't track this entry.
Message removed, the logic is just fine. What was I thinking (this is rhetorical!).
Luc Pattyn [Forum Guidelines] [My Articles] Nil Volentibus Arduum
Please use <PRE> tags for code snippets, they preserve indentation, improve readability, and make me actually look at the code.
modified on Tuesday, January 11, 2011 4:29 PM
|
|
|
|
|
You get to decide whether or not others can post new messages on your profile forum. David would see "New Message", but you would not. Look at mine. I see "New Message", but I'm guessing you can't.
|
|
|
|
|
You're right. All is normal then. I'll fix my message. Thanks. I knew I wasn't going to track this.
Luc Pattyn [Forum Guidelines] [My Articles] Nil Volentibus Arduum
Please use <PRE> tags for code snippets, they preserve indentation, improve readability, and make me actually look at the code.
|
|
|
|
|
After some further investigation, I can't find a way to "decide whether or not others can post new messages on your profile forum." It looks like the owner is the only one who can start a new thread (which is probably just what I would want anyway). What say you?
Luc Pattyn [Forum Guidelines] [My Articles] Nil Volentibus Arduum
Please use <PRE> tags for code snippets, they preserve indentation, improve readability, and make me actually look at the code.
|
|
|
|